Description | Set of images showing the progress of the rebuilding of the Bank. All images have a caption under the image and a Bank of England copyright stamp and photographer's stamp on the verso.
1) HOD/1816/501 - A: 'Section No. 2 - boiler room from switchboard gallery, looking west - 30th January 1932.' 2) HOD/1816/502 - C: 'Section No. 2 - boiler room, generator sets, looking north west - 30th January 1932.' A piece of machinery has the visible brand name 'Paxman'. 3) HOD/1816/503 - D: 'Section No. 2 - boiler room, looking east - 30th January 1932.' 4) HOD/1816/504 - E: 'Section No. 2 - deep well pumps numbers 1 and 2 - 30th January 1932.' A sign is visible 'Legrand, Sutcliffe and Gell, Ltd, / Artesian Well Engineers / London'. 5) HOD/1816/505 - F: 'Section No. 2 - main pump room - 30th January 1932.' 6) HOD/1816/506 - G: 'Section No. 2 - pilot engine room, looking west - 30th January 1932.' 7) HOD/1816/507 - H: 'Section No. 2 - pilot engine room, looking east - 30th January 1932.' 8) HOD/1816/508 - I: 'Section No. 2 - oil pump room, looking south west - 30th January 1932.' 9) HOD/1816/509 - J: 'Section No. 2 - oil pump room, looking north east - 30th January 1932.' 10) HOD/1816/510 - K: 'Section No. 2 - pipe space under boilers, looking east - 30th January 1932.' |